WL. I was there in September as part of a split stay and the construction was minimal. They were doing some painting on the ceiling in the drive and some exterior painting, but it was so non invasive I can't even remember where besides the entrance. And it didn't effect anything. No major construction, more minor touch up projects. The CCV rooms are due for a rehab soon, though I don't know if it is even scheduled yet. That is not the current "construction". There will be more information all over once that starts.