I don't understand why it's going to take at least 1 full year to get Splash re-themed. The basic structure is already built and the ride track isn't changing. You basically have to change out animatronics, re-skin the mountain, change out the boats for a different style, probably add some projections, and adjust the line queue. If you have all the materials on hand, this should move quick. Not overnight, but quick. If you don't have all the material on hand, then you shouldn't close the ride until you do. Particularly these days. Supply chain can easily turn 1 year into 2 if you just assume that the material will arrive when you want it to. You would think they learned that lesson from Tron.