I didn't think that us newbies could make ressies until we closed. My guide said that the paperwork would probably come Dec 31st when I made my deposit on Dec 27th(Merry Christmas to me
) but it didn't come until Jan 3rd or 4th. The problem is that I'm paying but my mom and sister's names are on it also and it went to my mom's address which is also my sister and my permanent address needing all three of our signatures and to be notarized etc. Well, I drove the 6 hours backs to ME on Jan 2nd and my sister flew back to VA because we both had class Jan 3rd. On the bright side when mom called them about it, they said that they would reissue the paperwork so that the signatures could be added separately and would coordinate getting it to me in ME and to VA but its definitely going to drag out the process. I want ressies for a studio at either OKW or home(SSR) for May 29th-June 5th and for a 1 bedroom at SSR from Dec 18th-23rd. Due to my school and military commitments, I have very little date flexibility so the earlier I can make ressies, the better obviously. So in summation, if knows if you can make ressies before closing please let me know. On a side note, I would also love to rent 40 points to stay at HHI from 3/13-3/18. I have ressies for Marriott but given the chance to stay at DVC HHI, no contest.
