Realistically, lounge doesn't reopen until Jambo hotel reopens. And it's one of the properties with no planned date; there is one deluxe with an announced date right now (GF). WL, BW, BC and Jambo are all in the holding pattern. Poly is "not until next summer."
I feel like Jambo would be behind at least BW and BC if they start adding properties, just because BW and BC are so much smaller (demand would have to explode to want to reopen more than 1 at a time). Jambo is 972 units, BW is ~570ish, BC is 580, and WL is 430.
Plus, Coronado is reopening around the same time as GF, and they're adding AOA in November. So that's adding a lot of units before year-end even before talking adding more deluxes.