ekatiel
DIS Veteran
- Joined
- Jul 5, 2008
- Messages
- 2,003
I am working on our personalized touring plans for our trip in March. When I put in certain popular rides at rope drop, it is still giving me long-ish waits. For instance, if I put in Test Track at rope drop, it tells me I'll be waiting 30 minutes. It gives about the same wait for TSMM at rope drop. Have things changed since our last visit (pre-FP+ days) so that even if you are among the first people in the regular line, you still will have to wait because others may be in the FP+ line right at rope drop? OR, is the program just being ultra conservative-- assuming that I won't be near the front of the pack at rope drop? Trying to decide whether to leave these rides at the front of the plans or not.