3DisneyKids
More Drink, Less Run...Since 2008
- Joined
- Aug 13, 2005
- Messages
- 7,936
Ok...just back from a great trip at SSR (got off the plane about 4 hours ago
...miss it already!).
Anyway, our villa was truly right across from the theatre. I had to walk by it about 5 times a day...and each and every time, I stopped, and listened...trying to hear sounds of construction or something on the inside, etc. It was dead in there. I did not see anyone go in or out the entire time and I never head any sounds coming from inside. If this is where the new AKV models are going to be, they don't seem to be in a rush to get them done. And yeah...people definitely thought I was whacked as they saw me "eavesdropping" at the theatre!
I must have stopped at every DVC stand in the parks to talk about AKV and everyone was willing to talk--I didn't get even one "Gee, we can't talk about that yet." For the most part, they only reiterated what is already known here, but added some details:
SOME (and only SOME) of the 1 BRs will accommodate 5 and have a second bathroom. These are not expected to cost more points (points charts not available yet, so this is speculation on the CMs' parts), but these will be a confirmed ressie. The analogy they made was like a dedicated 2 BR vs. lock-off...same points, but you have to specify which type you want. That makes sense to me.
As for the second bath, they didn't know if this would be a powder room (just sink and toilet), full bath, 3/4 or what.
As for size, the CMs said that the 1-BRs will be about 2 feet longer in each room (living and bed)...though this may not sound like much, it will definitely add some space. DH is an engineer and though he did not have his measuring tape with us, he was able to look at the pics of the 5th and 6th floor and estimated that this would add about 70 - 85 sq. feet to each villa.
Pricing and points are still not available, of course, and at least 3 of the CMs I spoke with said that these cannot be made public--by law--until a certain percentage of the construction was complete (not sure how much). So, I think we are in for a bit of a wait when it comes to getting these answers.
NONE of the CMs would even speculate as to what they thought the points and prices might be. They were all very excited to talk about the project in general, though.
Sales are predicted to begin in late Jan. - early Feb.
So, that's the news from the home front...

Anyway, our villa was truly right across from the theatre. I had to walk by it about 5 times a day...and each and every time, I stopped, and listened...trying to hear sounds of construction or something on the inside, etc. It was dead in there. I did not see anyone go in or out the entire time and I never head any sounds coming from inside. If this is where the new AKV models are going to be, they don't seem to be in a rush to get them done. And yeah...people definitely thought I was whacked as they saw me "eavesdropping" at the theatre!

I must have stopped at every DVC stand in the parks to talk about AKV and everyone was willing to talk--I didn't get even one "Gee, we can't talk about that yet." For the most part, they only reiterated what is already known here, but added some details:
SOME (and only SOME) of the 1 BRs will accommodate 5 and have a second bathroom. These are not expected to cost more points (points charts not available yet, so this is speculation on the CMs' parts), but these will be a confirmed ressie. The analogy they made was like a dedicated 2 BR vs. lock-off...same points, but you have to specify which type you want. That makes sense to me.
As for the second bath, they didn't know if this would be a powder room (just sink and toilet), full bath, 3/4 or what.
As for size, the CMs said that the 1-BRs will be about 2 feet longer in each room (living and bed)...though this may not sound like much, it will definitely add some space. DH is an engineer and though he did not have his measuring tape with us, he was able to look at the pics of the 5th and 6th floor and estimated that this would add about 70 - 85 sq. feet to each villa.
Pricing and points are still not available, of course, and at least 3 of the CMs I spoke with said that these cannot be made public--by law--until a certain percentage of the construction was complete (not sure how much). So, I think we are in for a bit of a wait when it comes to getting these answers.

Sales are predicted to begin in late Jan. - early Feb.
So, that's the news from the home front...