- Joined
- Feb 10, 2008
- Messages
- 20,972
Congratulations! Thank you for your service.
That's absolutely the plan. I have a little wiggle room to negotiate with a pension and health care taken care of.Negotiate for more PTO when you find a new job!
Taking about 2 months, but trying to stay relevant in the marketOr just wait a year then get a job. Take a long trip........if you can that is.
It would be nice to not have to crutch around with ice and snow, but it's slow at work and the kids are home from school.Glad you are on the mend. A little extra down time now to get a better outcome later is worth it. You'll be able to enjoy the next RV trip a little more. And not a terrible time of year to be laid up.
j
Thanks. It wasn't a huge trip, but a weekend in the camper is a weekend in the camper.Sorry you have to cancel a trip. Glad the surgury went well even if recovery is longer. Till you can put some weight on it, hop well my friend.
Thats still good, lol. My old house had a lead shower liner for the pan. It was like 130 lbs, one peice for the liner. Flatened it into a block and sold it as scrap. Made like 6 bucks on it! Maybe a bit more, but I was happy to get rid of it!Sounds like your knee is coming along, so it is time for some inspiration.
I finished the new floor in my master bathroom shower. I think I posted pics of the broken morter bed and some how it was leaking into the porch below.
Here's the new tile And it doesn't leak. So that's a plus.
View attachment 736090
Time to tackle the downstairs bathroom. This was one of the first rooms we redid after we bought the house. It was getting dated, but the shower leaked on this one too. I was done before neoprene liners were common and the concrete board and thinset didn't hold up. This is going to be a complete gut to the studs. We already have a new vanity/sink, but everything else is going.
View attachment 736091View attachment 736092
Since you will be retired/unemployed soon, figured you could head east to help. You can even park your camper in the driveway.
j
That's a whole lot of nope! That mess of tile is giving me hives. We're preparing to start finishing the unfinished basement once I'm up on my feet and the weather is a little better to move out and clean out a bunch of junk we've held on for too long.Sounds like your knee is coming along, so it is time for some inspiration.
I finished the new floor in my master bathroom shower. I think I posted pics of the broken morter bed and some how it was leaking into the porch below.
Here's the new tile And it doesn't leak. So that's a plus.
View attachment 736090
Time to tackle the downstairs bathroom. This was one of the first rooms we redid after we bought the house. It was getting dated, but the shower leaked on this one too. I was done before neoprene liners were common and the concrete board and thinset didn't hold up. This is going to be a complete gut to the studs. We already have a new vanity/sink, but everything else is going.
View attachment 736091View attachment 736092
Since you will be retired/unemployed soon, figured you could head east to help. You can even park your camper in the driveway.
j
It definitely does for everything else. We can run whatever we want...microwave, electric water heater, etc. Just not the front AC.When on the genset does power assist help, or not really?