corpcomp
The 100 Yard Dash and Mr. D
- Joined
- Apr 1, 2006
- Messages
- 1,634
vonpluto said:If you calculated the dimensions from the figures printed along the bearing lines, I think you're misreading these surveys.
The lines from the Point of Commencement to the Point of Beginning are just survey shots to locate the area of construction for the new gates.
I think these drawings show exactly what the permit states, "Enhancements to Cast Parking". It appears to show two new gatehouses for the cast lot, although it could be a set up for a construction lot.![]()
BTW, these gates are shown to the right of World Drive, where it enters the backstage area.
In searching thru the comptrollers website, I did come across these permits:
New heater for the pool at OKW.
New security camera system for the gatehouses at SSR.
New cedar shingle roofing for the lower roof at VWL.
One other note, all three of these permits were for DVC or DVD, the gate permit was for the Walt Disney World Co.![]()
![]()
What?? No new roof tiles for BCV??
