Well if anyone was sleeping in an old Alligator Bayou double-bedded room last night, you would have been among the last few. The final two AB buildings (26 and 35) today go down for refurbishment, so the last of the old rooms (and those old double beds & trundles) will have gone away forever.
So currently, buildings 25, 26, 34 and 35 are down for refurbishment. Two of them (25 and 34) are due back within a week, and the final one (26) should be completed in about four weeks. It really doesn't seem like nearly two years since this all started at POFQ does it?
Meanwhile, in the Riverside lobby, work is drawing to a close on the refit there too. The construction walls are due to come down tonight, and front desk/check-in services should be operating from their new desks on Monday morning. Just for tomorrow only, concierge services will remain at their temporary River Roost location, and these will be moved over during Monday night and on Tuesday morning everything should be complete (barring a few very minor finishing touches apparently). Can't wait to see what it looks like!
Andre
So currently, buildings 25, 26, 34 and 35 are down for refurbishment. Two of them (25 and 34) are due back within a week, and the final one (26) should be completed in about four weeks. It really doesn't seem like nearly two years since this all started at POFQ does it?
Meanwhile, in the Riverside lobby, work is drawing to a close on the refit there too. The construction walls are due to come down tonight, and front desk/check-in services should be operating from their new desks on Monday morning. Just for tomorrow only, concierge services will remain at their temporary River Roost location, and these will be moved over during Monday night and on Tuesday morning everything should be complete (barring a few very minor finishing touches apparently). Can't wait to see what it looks like!
Andre