I think most of the refurbishment was regular maintenance, like repainting and repairing but not changing the scenes very much (other than the one scene which has been mentioned). It was too short a refurbishment for the entire ride to be given a huge modification, although it would have been nice to have newer AA figures throughout. I would expect 6-12 months downtime if they ever re-do all of the scenes.