Just a little update out of Meyer Werft. They just announced RCCLs first steel cutting. In May of 18 was P and Os first steel Following that pattern, Id expect a
DCL nb first cut around Septemberish.Maybe a little sooner. Average seems to be between 4-8 months between steel cuttings.
Looking at the webcams, the ship that's about done and closest to the door is the RCCL ship, the ship in front is NCLS with PandOs blocks next to both. Once the RCCL ship floats out, the NCL will move back and take her place with PandOs blocks taking her place. After that would be RCCLs next Quantum class with most likely DCL infront of her.
So the order in hall 2 should be
RCCL (Currently near completion )
NCL(infront of RCCL)
PandO (Blocks mixed in with NCLs next tot the drydock)
RCCL Quantum class
DCL newbuild #1
This is just a best guess but it's been working so far.