Staying at OKW for 2 weeks from the 20th September.
Does anyone know which buildings are currently being refurbished and if they are likely to be completed by the time we go.
From what I can find online buildings 30-35, 45-47, and 53-56 are done.
Looking to get a refurbished room as close to turtle pond pool as possible.
Does anyone know which buildings are currently being refurbished and if they are likely to be completed by the time we go.
From what I can find online buildings 30-35, 45-47, and 53-56 are done.
Looking to get a refurbished room as close to turtle pond pool as possible.