We've never tried dinner at 'Ohana. There are so many fine restaurants on the monorail circuit that we never seem to get around to it.
The construction by the new bus stop was almost finished when we checked in on the 26th. A couple of single sections of sidewalk needed to be completed and landscaping hadn't been started although the ground was graded. The part of the main parking lot that was blocked off for construction seemed smaller than in March/April. Anyway we checked out on the 29. Dropped by on the 2 and the sod was down and they were working on the landscaping. Picked up sandwiches for the plane trip on the 4th. The bus stop was complete and running, barriers were down and the parking lot was no longer blocked off at all.
As Tikiman reported there is a smaller section of the Rapa Nui parking lot blocked, too. Vans and equipment from an electrical and plumbing contractor are parked over there. Didn't notice if they were still there on the 4th but they might be as something else seems to be still going on. At the SE corner of the GCH, there is a barrier wall still up and a small one too at the NW corner of Raratonga. When we were there in March/April a guy told me they were redoing the pipes for the AC so maybe that was what was still going on.