Another poster had a rumored target date of the end of July for the DLRR (this was from one of the engineers). ROA may be up by 7/15 since that was the rumored return date for F!, according to the same poster. Of course, both these dates could change any and many times depending on circumstances.
We were at DL last week and the conductor stated their goal was for the RR to be up and running by August 1st. As we went over to check out the whistle and opposite side of the train tracks, the conductor there stated July 15th was the anticipated opening of the DLRR.
We were at DL last week and the conductor stated their goal was for the RR to be up and running by August 1st. As we went over to check out the whistle and opposite side of the train tracks, the conductor there stated July 15th was the anticipated opening of the DLRR.
I just saw a video on You Tube, and as of today there is now water in the new part of ROA. Looks like she was filming through a crack/knot hole in the wall over by the Hungry Bear.