NOt sure but it's pretty much done now.
They are even running the coaster empty now.
The theming is pretty much complete.
I would bet that they would do a soft opening before official opening.
We saw them running cars last week. I was surprised by the speed of the trains. It looked more like BTMRR than RnRC. I have read betwen 50-60 MPH's but it did not look like it was going that fast. Maybe slower for testing? I don't know. Either way the mountain looks amazing!!!
We saw them running cars last week. I was surprised by the speed of the trains. It looked more like BTMRR than RnRC. I have read betwen 50-60 MPH's but it did not look like it was going that fast. Maybe slower for testing? I don't know. Either way the mountain looks amazing!!!
The Grand opening press event in April 6-8. The dates are tentative but thats the latest.
It does go backwards in a portion.
The ride was clocked at something like 57 MPH or in around that area. That figure however is unofficial.
The height is 80 feet for the drop and the mountain is almost 200.