lockedoutlogic
DIS Legend
- Joined
- Apr 26, 2007
- Messages
- 15,781
I could see them converting some of the rooms vs. building new.
Not realistic...
They were figure 8 prefabbed concrete structures (all 64 rooms...not well designed) that had no ADA designs...
It would cost more to renovate than to build a new unit.