Yes, I am curious too. Anyone know what building they are on? We arrive next week!! Hoping they are through with that last Fantasia building but I doubt it. We are hoping for Dalmatians but if not, then Fantasia would be great too.
Now that the refurb is being done, ASMO will have a flat screen in every room. I saw in another thread that all standard rooms are done and the last twoo buildings left for work are Toy Story.
Now that the refurb is being done, ASMO will have a flat screen in every room. I saw in another thread that all standard rooms are done and the last twoo buildings left for work are Toy Story.
Now that the refurb is being done, ASMO will have a flat screen in every room. I saw in another thread that all standard rooms are done and the last twoo buildings left for work are Toy Story.
I'm fairly new to DISBoards and I'm loving it. This is a great thread and I'm loving the info! I'm planning a trip for Jan 2012 and was planning on staying at the ASM I'm curious if anyone knows if the refurbs will be done on all the buildings by that time? Also I'm wondering if construction will be going on during the day time (Concerned about midday naps and noise). Thanks!
Our family stayed at ASMo last week. They were working on Fantasia bldg that is to the left of the pool as you exit the lobby. I would say if you could get the Fantasia bldgs especially facing the pool would be awesome. We were in Toy Story and even though it was preferred we were at the very end towards the parking lot. We were close to bus stop but seemed a distance away from everything else.