If that's the case,
@StormyCA, that
big ol' diggin' hole will fill up with water about 12" down, maybe less. The canal nearby likely has the nearby water table at that very level.
If that's the case, that is (I'm not certain that's it).
But there will likely be some surface prep for the building footings, etc.
Ed