Got to the Fort at 6:50am, currently waiting for a site.
We took the dogs for a walk and were happy to see that the construction staging zone is gone.
View attachment 962118View attachment 962119View attachment 962120View attachment 962121
There are 3 premium loops closed, 500, 700 and 1100.
View attachment 962122
And the eyesore is continuing to grow.
View attachment 962123View attachment 962124
The front desk CM advised me that the Meadows construction is now scheduled to start on 5/8.
I’ll continue to report what I see. If anyone has any questions or requests, let me know and I’ll do my best.
It’s a nice morning with a good breeze blowing through the open windows as we sit in the overflow lot.