There will be constuction in the rest of that building. Mostly interior work like drywalling, painting, fixtures, furniture, etc. I booked for sept and the the CM read from a prepared script advising members of the ongoing construction. The first phase is the forward "wing" of the resort that runs waikiki to waianae (cloer to the front of the resort). The rest of the construction in the resort is on the section running mountain to ocean(closer to the lagoon). Phase 2 is scheduled for dec 2011 opening.