BWV time frame?

The rooms have been done for a few months now. They are doing work on the outside.
 
We just got home last weekend from our 10 night stay at the BWV. They are still working all around the main pool which requires detours (like cutting through the building). They also had a cluster of studios shut down on the first floor during our entire visit. Not sure if something went wrong during the rehab, but strange that it was only studios. We would past at least 10 there were out of inventory every day. Saw them hauling in drywall daily and tile. Was thinking they are redoing the bathrooms??? The parking lot near the tennis courts are still being used by the construction team and equipment. I really thought this would be done by this last visit, but it wasn't. We have been to BWV at least 4 trips now since the construction has begun and it's getting old now. We will be back there in 7 weeks.
 