Brian Noble
Gratefully in Recovery
- Joined
- Mar 23, 2004
- Messages
- 18,891
Agreed, though I'd also follow up in writing.If me, I’d call again to request this specific situation be escalated up the food chain.
Agreed, though I'd also follow up in writing.If me, I’d call again to request this specific situation be escalated up the food chain.
That bare spot is pretty lol.
If you are driving I guess it might not be a bad idea to bring a couple of bag chairs to have some more seating over in that area lol
The table in the studios was part of the single murphy bed and folded down to be a support underneath it. There wasn't a separate table.That huge blank space where the table and chairs used to be looks so out of place. Very stark. First thought though was we could park a scooter there at night to be out of the way and charge overnight, but there are no plugs there either. Just odd looking.
Yes, that’s correct. I looked at some old pics and there’s a door where that space is. Possibly what’s missing that makes this space look so empty! I’m in an end room!The table in the studios was part of the single murphy bed and folded down to be a support underneath it. There wasn't a separate table.
Looks like someone stole the armoire (wardrobe)! Where are you supposed to put your clothes, in that room ??This shot of the TV makes it look like someone stole the furniture lol
The table in the studios was part of the single murphy bed and folded down to be a support underneath it. There wasn't a separate table.
And up until the last reno (not current) that studio would have had the deacon's bench filling in open space along that wall.There was a separate round table with two chairs before the last reno. The attached table and chairs was the second set.
Any update on your situation?That was me.
They offered us a regular hotel room at the Inn side plus $100/night credit, but still at the 1 BR points. I guess I’m lucky in that they at least offered $100 for the 1BR to Inn studio downgrade. I still think it’s outrageous to not reduce to studio points. When I said I didn’t think that was a fair offer since I’m paying for a 1 BR and essentially getting a studio and not getting compensated for even their cash price difference that they charge for those rooms, the CM seemed to want to enjoy a good debate and replied that it was actually pretty generous of the resort because they could just contractually cancel.
This company is lost.
That is great news! Enjoy Stormalong Bay!Update - DVC made it right and moved us to a 1 BR at Beach Club instead!
I wish it didn’t take so many calls but happy with the outcome.
What is the root cause of such a delay here?
Glad it worked out. Disney should put a box of candy or something in your new room for causing such grief. I would have lost a lot of sleep not knowing what to do and feeling powerless.Update - DVC made it right and moved us to a 1 BR at Beach Club instead!
I wish it didn’t take so many calls but happy with the outcome.
There is a post in a similar thread that makes it sound like perhaps the Boardwalk view refurbs are wrapping up.Is anyone staying there now? How are the renos going? Probably everyone is sleeping late this morning. Hope everyone had a great New Year's Eve and the best year yet coming in 2024.
Thank you. I'll check that out. 13 days to check in.There is a post in a similar thread that makes it sound like perhaps the Boardwalk view refurbs are wrapping up.
https://www.disboards.com/threads/bwv-refurb-is-in-full-swing.3929918/post-65225128
13 days for us too! Geez time flies !Thank you. I'll check that out. 13 days to check in.