sndral
DIS Veteran
- Joined
- Feb 3, 2008
- Messages
- 5,814
The difference between your situation & OP’s is that Kidani is all DVC & the manager there is thus very experienced w/ DVC. Managers at the YC rarely deal w/ DVC bookings & probably know little to nothing about point stays.Bear with me for this long winded story but it is semi-relevant! Back in May my sister and I booked a last minute 1-bdr Savanna view at Kidani and unfortunately when we arrived the room had a really intense and horrible burnt plastic and bacon smell throughout. We opened both balconies and just sat out there for over an hour hoping the smell would dissipate, but it never did.
It started making me really nauseous and we decided to call down to mousekeeping to see if they could at least come give the space another cleaning, maybe that would help but when we got on the phone the front desk apologized profusely and said they’d call us back with a solution. About 10 mins later a lovely woman who introduced herself as one of the managers at AKL again, apologized and offered to move us to a Jambo studio hotel-side since that was all they had for the night if we didn’t want to stay in that room. There was no argument, no pushback, no “let’s try this first before taking other measures” just a sincere apology and let me fix this the best way I can.
We didn’t really mind since it was only 1 night and just the two of us but I mentioned that our room cost us X pts (I don’t remember how much off the top of my head right now) and if it was possible to get some of our points back since we were technically “downgrading” (although the hotel-side rooms are so much nicer than the current state of the villas I’m not sure if it’s fair to call it a downgrade but I digress!)
She said she’d have to get back to me and again called 10 mins later and said she couldn’t cover the whole value but could offer us 25 points back for the inconvenience, of course we accepted- we were expecting less tbh.
All this to say, they can definitely return points if they down grade you and/or if they put you in a non-DVC hotel/rooms. And further, they absolutely should return your share of points I can’t even believe they’re out right refusing. We got some points back and we weren’t half as inconvenienced as you are currently.
I will say speaking to the manager might have helped. I’m not sure if you’ve been able to speak to one at BW but she had the power to make decisions the regular castmates at the front desk couldn’t. And I know we only had 1 night for them to contend so maybe we got lucky but that shouldn’t matter. Like others have said, keeping calling them and demanding to speak to the higher up’s!
Good luck and I hope you get the best solution for your situation as possible!
I book 1 bedrooms because I travel w/ my adult child or w/ my adult child & their partner, I bought DVC to stay in 1 br.s or larger so that we each had a separate room to sleep in - a hotel room w/ 2 beds would not work for us due to the lack of privacy. The YC is a lovely resort - but the closest equivalent would be a suite IMO, if OP had wanted the space of one room they would have booked a studio and saved points - OP booked a 1 bedroom because they valued/wanted the extra space in a 1 br.. IMO the only equivalent would be a YC or BC 1 br. suite. OP’s request of a refund of the point differential between a studio & a 1 br. is very reasonable IMO.
It took a lot of effort to get this room booked at the 11 month mark so I will be so upset and disappointed if I receive a similar call
