Good to hear the rooms will be completed by October. Totally bummed the pool is going to be closed in OctoberVilla interior refurbishment will be completed August - October. Exact dates not revealed. BCV quiet pool closed for refurb October 2nd - early December.
At least you will still have access to the Beach Club quiet pool and Stormalong during that time - if you wish to use them!Good to hear the rooms will be completed by October. Totally bummed the pool is going to be closed in October. I know work needs to be done but you hate it when it’s being done during your trip.
At room 412 now and no music at 3:41pmIt's normally only at the main pools. As I mentioned I've never seen it at a quiet pool unless perhaps activities were moved if a main pool were being refurbed.
Also in studios on 4th floor
Looks like most if not all of the first floor. I took the back walkway from the villas to Epcot this morning and all of those first floor rooms are down.They are taking out the sofa pull outs from the BC Cash room this morning. Believe it's the first floor rooms being done based on a couple hallways closed.
including the villas or just the cash side?Looks like most if not all of the first floor. I took the back walkway from the villas to Epcot this morning and all of those first floor rooms are down.
All of the work is on the cash side. First floor of most of the hotel, and the lobby is also undergoing significant work. Temporary front desk and bell services set ups.including the villas or just the cash side?
So it's pods and a pot? I love that.
That sounds about right.Do I have it right in thinking that BCV refurbishment is supposed to start up again in August, then be done around Halloween?