Brian Noble
Gratefully in Recovery
- Joined
- Mar 23, 2004
- Messages
- 18,746
I can't believe no one else saw this this morning! From today's WDW Update at MousePlanet:
Construction update
Of course, nothing is certain until dirt moves (and, sometimes, not even then) but this is an interesting step for sure---a specific contractor is named for the Compound. The reason that this is claimed to be for GFV is that it uses the same project number listed on the impact disclosure.
http://forums.wdwmagic.com/showthread.php?t=677511&page=8
Edited: it was also noted up in the Resorts board:
http://www.disboards.com/showthread.php?t=2721675&highlight=stolport
Construction update
Here is the listing of interesting items from paperwork filed with Orange County in the last week:
Magic Kingdom Casey's Corner – interior improvements.
Magic Kingdom Swiss Family Robinson Treehouse queue area – general construction.
Magic Kingdom Swiss Family Robinson Treehouse exit bridge – construction.
Magic Kingdom Splash Mountain force main – plumbing.
Disney's Hollywood Studios Minn & Bill's Dockside Diner – construction.
Downtown Disney Marketplace – equipment installation.
ESPN Wide World of Sports HP Fieldhouse – additional graphics.
STOLport – installation of trailer compound for Grand Floridian Villas project.
Polynesian Resort building 2, Room 2225 only – structural work.
Port Orleans Riverside Magnolia Bend buildings 80 and 85 (Acadian House and Magnolia Terrace) – room renovations.
Of course, nothing is certain until dirt moves (and, sometimes, not even then) but this is an interesting step for sure---a specific contractor is named for the Compound. The reason that this is claimed to be for GFV is that it uses the same project number listed on the impact disclosure.
http://forums.wdwmagic.com/showthread.php?t=677511&page=8
Edited: it was also noted up in the Resorts board:
http://www.disboards.com/showthread.php?t=2721675&highlight=stolport