imbatman
DIS Veteran
- Joined
- Dec 29, 2017
- Messages
- 917
Week 24 goal update
Financial
Braces payments 
Pay off final CC with balance (0% through Oct. 2021) 
Purchase new mattress 
House Fund
652 / 2000
Roth
920 / 2000
Eat out three times per month or less
16 / 36
Spend Christmas somewhere else than home
Sell my 1963 VW Bug 
Professional
Watch online tutorials (video editing, manuscript/screenplay)
10/ 8
Finish manuscript #1 
Finish manuscript #2
Adventure
Spend Christmas somewhere else than home
Health
Lose 10 lbs
10 / 10
Keep living room picked up and everything in place each night/morning.
94 / 220 days
House
Declutter 500 items
382 / 500
Bathroom #1: 
Bathroom #2:
Remove awful mirrors (next to garden tub…yuck)
Texture where mirrors were removed
Repaint newly textured area
Touch up ceiling edges
Install shower diverter nozzle on garden tub
Install shower curtain hardware (depending on money)
Make shelving unit in blank space next to tub because the space is weird and this will create more storage.
Possibly replace light fixtures
Install frame around mirror
Flooring:
Clean living room and bedroom carpets
Repair carpet in Bedroom #2 at the doorway
Remove carpet and carpet tack strips in the hallway and living room
Paint baseboards prior to flooring installation
Install LVP flooring (already purchased)
Install door trim for LVP
Install ¼ round for all new LVP
Kitchen: 
Sell Pepe Le Pew collection
Financial



House Fund
652 / 2000
Roth
920 / 2000
Eat out three times per month or less
16 / 36

Professional
Watch online tutorials (video editing, manuscript/screenplay)
10/ 8

Finish manuscript #2
Adventure
Health
Lose 10 lbs

10 / 10
Keep living room picked up and everything in place each night/morning.
94 / 220 days
House
Declutter 500 items
382 / 500

Bathroom #2:
Remove awful mirrors (next to garden tub…yuck)
Texture where mirrors were removed
Repaint newly textured area
Touch up ceiling edges
Install shower diverter nozzle on garden tub
Install shower curtain hardware (depending on money)
Make shelving unit in blank space next to tub because the space is weird and this will create more storage.
Possibly replace light fixtures
Install frame around mirror
Flooring:
Repair carpet in Bedroom #2 at the doorway
Paint baseboards prior to flooring installation
Install LVP flooring (already purchased)
Install door trim for LVP
Install ¼ round for all new LVP

