Is the other track going to open sooner than the rockwork is finished? Or do they need to be on the ledges that contain the track or something to repair the damage?
I mean... half the Matterhorn is better than none of the Matterhorn, I suppose. I just have a newbie to the Disney Parks coming along and would’ve loved to have them experience both sides. We’ll be there in 11 days... not sure if they’ll have stuff up to snuff by then or not...