Just read a post about an electrical water pagent. The very first time I have seen anything about it and I've been reading these boards a lot with only 12 days left till lift off.
We will be there 5/6-5/11. Do I need to schedule this one in?
We will be there 5/6-5/11. Do I need to schedule this one in?