The story I saw said it is closing for just that one day.
The opening of the third track is scheduled for summer.
And actually, opening a third track will allow the ride to handle 50% more guests.
ETA- I see that the thread in which I originally posted this has been merged with a few others, and the post I was responding to no longer exists.