We are getting our tile put in 3 weeks. The guy told us about 4 days
day 1 tear out old tiel and carpet and prep floors
day 2 put in tile
day 3 i assume put in tile ?
day 4 seal it
we are getting in about 470 sq ft
I didnt think about question until now so i hope someone can help me.
1. once the tile is in how much time must pass before walking on it?
I need to know if we need to stay in a hotel for a night. Theres no way to get to kitchen, bathroom or bedroom without walking on the tile area
2. does it smell ? dd and I have allergies
3. anything else I should be aware of??
I'm hoping it wont take the 4 days but it doesn seem like a lot of work
day 1 tear out old tiel and carpet and prep floors
day 2 put in tile
day 3 i assume put in tile ?
day 4 seal it
we are getting in about 470 sq ft
I didnt think about question until now so i hope someone can help me.
1. once the tile is in how much time must pass before walking on it?
I need to know if we need to stay in a hotel for a night. Theres no way to get to kitchen, bathroom or bedroom without walking on the tile area
2. does it smell ? dd and I have allergies
3. anything else I should be aware of??
I'm hoping it wont take the 4 days but it doesn seem like a lot of work