With it being “dried in” by mid summer I would guess that if they have designed it with 2 hr firewalls in some areas that they would be able to get IBC 2006 certificates of occupancy in a partial area by no later than spring of 2009. If it does not have that level of separation then if might take until the fall of 2009.