With MMRR opening and having FP available for both rides, what do you think rope drop for MFSR will be like? Touring plans estimate 120 minutes for March 10.
I have trouble seeing it being that long with MMRR being less than a week old and SDD still there. Thoughts?
I have trouble seeing it being that long with MMRR being less than a week old and SDD still there. Thoughts?