The dbl-developer pts have a 12mnth use and a 7mnth ressie, so if I made a ressie with a UY of Feb, for june 2008, at 11 months out needing my '08 points to make the ressie, could I then change the points that they use to the dev pts and bank my '08 pts to '09?
ressi for June '08 needs 400pts
Use banked '07 and reg '08 UY pts to make ressi at 11mnths
then switch to dev pts prior to check in and bank '08 pts to '09 there by "saving my '08 pts"
Also does a reservation need to be made with pts in the bank or, if the ressi falls after the UY is that allowed w/o borrowing?
ressi for 7/09 (UY June) no points when ressi made, but knowing that ressi happens AFTER June UY points will be available w/o borrowing
thnx,
MJB
The dbl-developer pts have a 12mnth use and a 7mnth ressie, so if I made a ressie with a UY of Feb, for june 2008, at 11 months out needing my '08 points to make the ressie, could I then change the points that they use to the dev pts and bank my '08 pts to '09?
ressi for June '08 needs 400pts
Use banked '07 and reg '08 UY pts to make ressi at 11mnths
then switch to dev pts prior to check in and bank '08 pts to '09 there by "saving my '08 pts"
Also does a reservation need to be made with pts in the bank or, if the ressi falls after the UY is that allowed w/o borrowing?
ressi for 7/09 (UY June) no points when ressi made, but knowing that ressi happens AFTER June UY points will be available w/o borrowing