KNovacovschi
DIS Veteran
- Joined
- May 30, 2007
- Messages
- 6,274
I plead guilty to saying "I want more color," but this may turn into one of those "be careful what you wish for" kind of things.
I agree with you, orange, yikes

I plead guilty to saying "I want more color," but this may turn into one of those "be careful what you wish for" kind of things.
I just went and looked at some pics/ video of the Cabana Bay rooms and I think you may be onto something! They are very retro-60s and I am suddenly buying the turquoise/orange idea if they do it well. It's not something I ever would have come up with, but it just might work.
Judging by the pace of this renovation, it looks like this may be our first trip that we're not able to stay in the 50's section this September. I don't really care if it's refurbed or not, but we love the 50's, so hopefully it's either finished or hasn't started yet by the time we're there.
that would fit with the fact that no preferred pool rooms were available from sometime in November thru December when I was bookingAssuming they are going around clockwise from the 80's/90's, I think you should be fine. I figure they might be somewhere in the 60's by September.
that would fit with the fact that no preferred pool rooms were available from sometime in November thru December when I was booking
We were in building 7 and it was about the same distance to walk around the lake instead of the bridge.I really hope the bridge doesn't need to be closed down.
I haven't read this whole thread so I apologize if this has already been answered. We are booked in October for a preferred room- are the preferred rooms being renovated first? I am hopeful to get one!
How do we know that there isn't? Actually I'm sure there are some finished rooms. If they are going to start renting them out in June, there should be some done.
It's always possible that some piece of décor or furniture was ordered, but the delivery delayed. So the first batch of rooms may take longer because of delivery delays, and since the items would now be coming in, the later buildings could be processed faster. I remember when we were having our house built, things would move like gangbusters and then screech to a halt to wait for something that was delayed, and then take off again, then stop again. It was annoying, but it happens - especially in Florida. I have already requested a renovated room for my September trip, so I hope they have some ready by then.
Completely understand and agree with what you said. However, my only point was to respond to a poster that couldn't believe they haven't completed a single room. We have no idea that they haven't. They could have 10 rooms completed, but if they haven't completed the whole floor/wing, they aren't going to assign those completed rooms.
Completely understand and agree with what you said. However, my only point was to respond to a poster that couldn't believe they haven't completed a single room. We have no idea that they haven't. They could have 10 rooms completed, but if they haven't completed the whole floor/wing, they aren't going to assign those completed rooms.