Pool slide progress

BobH

DIS Veteran
Joined
Mar 19, 2000
Messages
1,384
My wife & I were at OKW from 10/24 through 10/29. It appears that the work has just started on the pool renovation and slide installation. Some concrete pillars were poured that I believe might be the support for the slide structure. There was netting around the existing light house and it appeared that it might have been worked on. You could look right into the construction site from Peninsular Drive and it appeared that not much else has been done. It wasn't worth taking photos yet. We only saw 3 or 4 workers at any time we went by.
 
Thanks for the report. I was hoping they would be a little farther along since we are going to be there on 12/15.:(
 
Hi all, got like 4 pictures of the slide progress, but I don't know how to post them.

If someone wants, I'll email to them, and they can post?

Really tired,

goldi

email is:

goldilocks_63@yahoo.com


Great Trip, wonderful weather, OKW beautiful. I wanna go back!
 



















DIS Facebook DIS youtube DIS Instagram DIS Pinterest

Back
Top