For those of you with upcoming reservations concerned about the POFQ pool renovation, it has not started yet. It is scheduled to begin January 29.
We just came back yesterday and based on what we read here before we left (and what we were told on the phone when we called to doublecheck!!!), thought that the pool was already closed. Thankfully it wasn't!
Don't know how long it's scheduled for, but the pool looks to be in good shape and repair, so hopefully it won't be too long.
We just came back yesterday and based on what we read here before we left (and what we were told on the phone when we called to doublecheck!!!), thought that the pool was already closed. Thankfully it wasn't!
Don't know how long it's scheduled for, but the pool looks to be in good shape and repair, so hopefully it won't be too long.