ArielSRL
DIS Veteran
- Joined
- Oct 23, 2006
- Messages
- 8,157
That is what I've heard, too.I heard in a Facebook group from a CM for that ride that it will not completely close but only one track will be open April and May and there will be no fast passes for the ride during that time.
I wonder if that will be the third track. I’m not sure how they would be able to have just one track from the original side open. Those first two tracks load at the same place.I heard in a Facebook group from a CM for that ride that it will not completely close but only one track will be open April and May and there will be no fast passes for the ride during that time.
FWIW, Disney call center CMs are confirming that TSM will be standby-only April 9-May 7. I don't ever put stock in what they say, but the end date gives a bit more credence to the idea.
While it's going to be a crazy long line, this actually makes me feel better about keeping our HS plans. I don't mind waiting if we are at least going to be able to ride it at some point.
Not necessarily. It’s expected though since they did it with Pandora.Do they always do pass holder previews?
FWIW, Disney call center CMs are confirming that TSM will be standby-only April 9-May 7. I don't ever put stock in what they say, but the end date gives a bit more credence to the idea.
Pandora was the first entire Land that opened in ages. NFL was the last and it was different, being an expansion and in the middle of an existing land. They didn't have an Passholder previews for it but they did pull in folks as they were in the area for soft openings. Since TSL is more like Pandora than NFL I'd expect to see them do the same as with Pandora.Do they always do pass holder previews?
This has me thinking. If let’s say the entire land isn’t finished but the TSMM entrance is would they just open a route to the new entrance so they can go up to full capacity before the land opens?
There's no word what happens after the end date. It could open back up to the public/FPs or Disney could start previews for TSL.My DHS/Cinemagine/whatever they're calling it date is May 9...I guess I'll find out next month if that end date is accurate
I’m not so sure. TSMM is still operational and has been opened since 2008? Keeping it open and having the new entrance would mean fully operational and keeping the capacity in DHS up. They don’t have a lot of capacity in DHS to begin with. Keeping TSMM under full capacity only hurts.Doubt it