OSUZorba
DIS Veteran
- Joined
- Sep 5, 2014
- Messages
- 2,246
Much better than a SBNO. Wish they would've done of this to Son of Beast as opposed to bulldozing it.It’s the replacement for the dual track wooden Gwazi, the Lion track closed in 2012, the Tiger track closed in 2015. So it’s a replacement, but Gwazi had gone beforehand.