Half of Ripsaw Falls bridge....

h20jag

<br><font color=green>DIS Veteran<br><font color=m
Joined
Dec 18, 2000
...was partitioned off last Saturday. Anyone know if it's maintenance or something being added?
Jim
 
Just routine maintenance.

There was a number of problems with the old surface of the bridge. Colors were bad - plus the biggest problem was the strength of the old surface. In fact, the old surface was cracking and falling to pieces.

So, the Toon Bridge is getting a new surfacing. Just like the highway department does to road bridges. The concrete was removed down to the supports, and a new surface has been poured - which looks ALOT better and will last much longer than the old one.

The whole bridge should be back open in the next few days.
 
You have nailed it. The Toon Bridge project wrapped up last night. Surface work is done and the fence is down, bridge is fully open as of this morning.
 
















GET A DISNEY VACATION QUOTE


Our Dreams Unlimited Travel Agents will assist you in booking the perfect Disney getaway, all at no extra cost to you. Get the most out of your vacation by letting us assist you with dining and park reservations, provide expert advice, answer any questions, and continuously search for discounts to ensure you get the best deal possible.

CLICK HERE




DIS Tiktok DIS Facebook DIS Twitter DIS youtube DIS Instagram DIS Pinterest

Top