Dean
DIS Veteran<br><a href="http://www.wdwinfo.com/dis
- Joined
- Aug 19, 1999
- Messages
- 39,228
Whole contracts cannot be split. I'm sure this was someone who had an 150 pt contract with a 100 point add on or something to that affect.Originally posted by fkj2
That answers one of my questions; they're able to split a larger amount into smaller ones, right or is that only possible if there was an original contract and an add-on?
fkj2@netscape.net