Could possibly add RoL to that list too...
I sort of see RoL as the opposite - they had an opening date but then didn't open then as they couldn't get it working right ... vs opening then while still having the tech issues and it not working consistently/properly. Similarly with pushing back opening of MMRR and RotR (though one could argue they should have pushed the entire GE Land opening back until RotR was ready to go, but toothpaste is out of the tube at this point)
I'd also include the QS location being built in TSL. Also, the umbrellas they had to put up after the fact. Both seem pretty obvious to park veterans. Imagineering would in be that group, frankly.
TSL definitely felt rushed to finish it for the opening date they picked