Does anyone know when the rehab will be done?
Not sure about ther cabins, but here is the loop schedule I have seen:
The conversion schedule is as follows:
(Schedule subject to change without notice)
Loop 900 closed 7/08 to 7/25 reopens 7/26/08.
Loop 1000 closed 7/27 to 8/08 reopens 8/09/08.
Loop 1100 closed 8/10 to 8/22 reopens 8/23/08.
Loop 500 closed 8/24 to 9/21 reopens 9/22/08.
Loop 800 closed 9/22 to 11/01 reopens 11/02/08.
Loop 400 closed 11/03 to 11/21 reopens 11/22/08.
Loop 600 closed 11/30 to 12/19 reopens 12/20/08.
Loop 1300 closed 1/4 to 1/23 reopens 1/24/09.
Loop 1200 closed 1/25 to 2/06 reopens 2/07/09.
Loop 1400 closed 2/08 to 2/13 reopens 2/14/09.
Loop 700 closed 3/15 to 4/03 reopens 4/04/09.
Meadow Swimmin' Pool, enhancements to this area are planned, including the addition of a slide and hot tub, but exact refurbishment dates have not be released as of yet.