Saw on the community board that the ride seats 40 people and lasts 4.5 minutes. That turns out to be about 600 people an hour. Is that a lot? What does test track handle? It seems that fastpasses are going to run out very quick and lines will be long.
It's 40 people per cycle, with four separate simulators. So it's 160 people every 6 or 7 minutes or so (not sure how long it really takes to load and unload these things).