well, after all the info about the construction and all the good things I've seen about CSR I've changed our reservation.
When I spoke to the CM this morning she said the construction is moving inside the buildings at AKL as of May, into ALL the buildings and you will most definately "notice" the noise and construction equipment.
If you're out all day every day she said you wouldnt notice as they're done by 4 - 5pm but if like us you have rest days at the resort it will be something you will see and hear. We live on a construction site and we dont want to see anymore!
so - off to CSR we go, she said we'll love it, we'll go back to AKL once the renovations are done, and we've saved $1000 into it as well! from wat I can see CSR is between moderate and deluxe so I hope we'll like it - I'm sure we will.
When I spoke to the CM this morning she said the construction is moving inside the buildings at AKL as of May, into ALL the buildings and you will most definately "notice" the noise and construction equipment.
If you're out all day every day she said you wouldnt notice as they're done by 4 - 5pm but if like us you have rest days at the resort it will be something you will see and hear. We live on a construction site and we dont want to see anymore!
so - off to CSR we go, she said we'll love it, we'll go back to AKL once the renovations are done, and we've saved $1000 into it as well! from wat I can see CSR is between moderate and deluxe so I hope we'll like it - I'm sure we will.