CCV Renovation Resort Impact

KSR0330

DIS Veteran
Joined
Jan 1, 2015
Messages
1,289
We need to move up our end of August trip and I'm trying to book a resort room for next week and I’m considering BRV. How is the work on CCV impacting the resort? Thanks!
 
There’s some scaffolding for exterior work in the main building. Last time I was there the impact was minimal and everything was working as usual.
 
I was there 2 weeks ago and the only scaffolding I saw was in the outside area along the hallway that leads to Roaring Fork. The rooms on the first floor of CCV facing the courtyard looked to be under renovation as the sliders were blacked out by something covering the glass. There was also a sign in the lobby that said the 3rd floor was closed. But no real impact. I'll be back there in 3 weeks, about the same time as you!
 
















DIS Facebook DIS youtube DIS Instagram DIS Pinterest DIS Tiktok DIS Twitter

Back
Top