We returned from CBR on 12/15. The construction at this point doesn't involve the pool itself. They are apparently going to expand the pool deck out to the water's edge, and the work being done now seems to be putting in the retaining walls on what would seem to be the new pool deck perimeter and building what appears to be a wooden deck or walkway outside those walls, right at the edge of the lagoon. If you look at the pictures that safetymom has published on the CBR FAQ II thread, you'll see what I mean. The main pool was in full swing when we were there, and enjoyment of it was completely unimpeded by the construction, which is screened behind large temporary fences.