MinnieGirl33
DIS Veteran
- Joined
- May 16, 2003
- Messages
- 4,789
Just saw this listed with the other permit filings on another site 
Bay Lake Tower Lock-off renovation mock-up (selective demo and renovation).
Not sure if the link will post but... http://www.mouseplanet.com/9160/Walt_Disney_World_Resort_Update
If they are going to start renovating I think the first thing they need to address is the bathroom lighting
... and marble floor in the elevator lobby on the 5th floor. It becomes slippery and, IMO, dangerous when it rains.
Anybody have the inside scoop?

Bay Lake Tower Lock-off renovation mock-up (selective demo and renovation).
Not sure if the link will post but... http://www.mouseplanet.com/9160/Walt_Disney_World_Resort_Update
If they are going to start renovating I think the first thing they need to address is the bathroom lighting

Anybody have the inside scoop?