

Joking aside though, did the Norway facility of PFT really have that much room to hold a 4-5 hour long line? It seems so absurd to me, but maybe I'm underestimating how much space PFT hall takes up.
It didn't, that is why they are at MK now.
If you have been to Norway during the reign of A&E, you saw the lines that snaked around the inside of the pavilion, past Akershus (you had to fight through if you wanted to check in for Akershus, and then if you were waiting for Akershus you couldn't just hang in the pavilion - they had a "holding pen" just for Akershus) and into the China pavilion. (Those were the 4-5 hour lines - a 7 hour one may have taken up some space in the China pavilion.)
It may not have been built for lines quite that long, but it is much better suited to it than Norway is.
Geez, are they using 2 sets as well?