Week 35 Results
First paycheck of the school year!
Financial
Tokyo Disney Vacation
1850 / 2600
ABD Costa Rica
0 / 2600
WDW Vacation
1850 / 2600
Scandinavian Cruise
299 / 2600
Misc Travel
348 / 500
Brokerage Account
6925 / 10000
403b (me)
9000 /12500
457 (wife)
9500 / 13000
Roth
1600 / 2500
✔+Round Up Savings Account
1659 /1000
✔New Car Fund
2000 / 2000 will mark ths as completed as we moved up the purchase of the new car by about 9 months because we got the trade in value we wanted and the price of the new car was lower than anticipated with a lower intrest rate, Had to move some money around to make it happen but it works, so that is what was important!
Land Fund
252 / 1000
Dog/Vet Fund
418 / 500
Remodel Fund
2050 / 3000
✔Roof Fund
5000 / 5000 Got quotes and they came in under budget, signed contract and currently on the list to get it done. Quote came in at 4985 (half of what I was budgeting) so I am changing the goal from 10K to 5K and instead of waiting until spring 2026 will now be completed in spring 2025
Cut Discretionary Spending 10%
Eat out less than once per week
37 / 44
✔Run Annual Credit Reports
Life
Read 40 Books
12 / 40
✔Run Annual Credit Reports
✔✔+Less Procrastination (if it takes 15 minutes or less to do, just get it done!)
135 / 52
✔Adventure
Spend a vacation someplace new (in addition to our yearly WDW vacation)
Chicago trip completed
Health
Lose 20 lbs (current 220)
5 / 20
House
Keep kitchen counter and table cleaned off
185 / 260 days
Declutter 500 items
407 / 500
Short Term House Projects (0-12 months)
✔Paint outside basement foundation
✔Fill Basement cracks (stone basement)
✔Caulk Porch windows / trim x7
✔Clean up flower beds and fences
Insulate Hot Water tank
Insulate water pipes
✔Finish cleaning out various items from basement
✔Clean out and organize shed
✔Reseal shed floor
✔Fix shed doors
✔Touch up paint on shed
✔Paint back porch floor
✔Repair front porch window screen
✔Paint Kitchen Ceiling
✔Paint Kitchen Walls
Remove Window Shutters from entire house
Remove Sat Dish
Replace missing aluminum roof trim (x2)
Long Term House Goals (12-60 months)
✔New Roof Main part of house (18 months)
Reinsulate the basement (60 months)
Replace Basement windows (60 months)
Remodel office (new sheetrock, new electric, new trim, new flooring, new electric heater) (48 months)
Remodel Kitchen (new sheetrock, new electric, new trim, new flooring, new cabinets, new backsplash tile, new electric heaters, new sink, new countertop) (48 months)
Remodel Bathroom (new sheetrock, new electric, new exhaust fan, new walk in shower w/ tile, new heater, new sink, new flooring, new trim) (48 months)
Mortgage payoff (48 months)
Paint house (60 months)
Bonus Tasks Completed:
✔Recaulked tub
✔Washed all front porch windows inside and out
✔Installed new seat covers for new car
✔Filled Driveway Cracks
✔Cleaned dust bunnies off back/under fridge and stove
✔Cut back snowball bush to ground level for new shoots next year (well overgrown, 10ft tall and branches were thumb size!
✔Scraped front porch trim work and shed trimwork
✔Painted front porch trim work