I must be tired--leaving for the World Saturday, planning a June SeaWorld trip with grandkids, and working on another solo trip for me in September. I don't even know why I'm torturing myself this far in advance--I just dont want to mess anything up! Yes, I know it's really 2008 now, and that 11 months out will be JUNE 28

I had that written down. I know the 180 days for ADRs isn't the same as six months--I just wanted to be absolutely sure that 11 months in this case is
really 11 months, and that I don't need a calculator for it. Thanks for your help